    "Date": "29-04-2026",
    "Hour": 1,
    "Time Block": "00:00 - 00:15",
    "Purchase Bid (MW)": 7017.9,
    "Sell Bid (MW) - Total (MW)": 358.3,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 350.3,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 358.3,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 350.3,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 358.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 350.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 1,
    "Time Block": "00:15 - 00:30",
    "Purchase Bid (MW)": 6995.7,
    "Sell Bid (MW) - Total (MW)": 359.5,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 351.5,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 359.5,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 351.5,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 359.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 351.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 1,
    "Time Block": "00:30 - 00:45",
    "Purchase Bid (MW)": 6854.8,
    "Sell Bid (MW) - Total (MW)": 363.6,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 355.6,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 363.6,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 355.6,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 363.6,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 355.6,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 1,
    "Time Block": "00:45 - 01:00",
    "Purchase Bid (MW)": 6693.1,
    "Sell Bid (MW) - Total (MW)": 366.6,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 358.6,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 366.6,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 358.6,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 366.6,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 358.6,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 2,
    "Time Block": "01:00 - 01:15",
    "Purchase Bid (MW)": 6588.1,
    "Sell Bid (MW) - Total (MW)": 365.5,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 357.5,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 365.5,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 357.5,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 365.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 357.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 2,
    "Time Block": "01:15 - 01:30",
    "Purchase Bid (MW)": 6059.7,
    "Sell Bid (MW) - Total (MW)": 365,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 357,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 365,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 357,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 365,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 357,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 2,
    "Time Block": "01:30 - 01:45",
    "Purchase Bid (MW)": 5710.2,
    "Sell Bid (MW) - Total (MW)": 354.9,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 346.9,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 354.88,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 346.89,
    "MCV (MW) - Hydro (MW)": 7.99,
    "Final Scheduled Volume (MW) - Total (MW)": 354.88,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 346.89,
    "Final Scheduled Volume (MW) - Hydro (MW)": 7.99,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 2,
    "Time Block": "01:45 - 02:00",
    "Purchase Bid (MW)": 5782.4,
    "Sell Bid (MW) - Total (MW)": 343,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 335,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 343,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 335,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 343,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 335,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 3,
    "Time Block": "02:00 - 02:15",
    "Purchase Bid (MW)": 5038,
    "Sell Bid (MW) - Total (MW)": 363.5,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 355.5,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 363.5,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 355.5,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 363.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 355.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 3,
    "Time Block": "02:15 - 02:30",
    "Purchase Bid (MW)": 5119.8,
    "Sell Bid (MW) - Total (MW)": 356.1,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 348.1,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 356.1,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 348.1,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 356.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 348.1,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 3,
    "Time Block": "02:30 - 02:45",
    "Purchase Bid (MW)": 5022.7,
    "Sell Bid (MW) - Total (MW)": 332.2,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 324.2,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 332.2,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 324.2,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 332.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 324.2,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 3,
    "Time Block": "02:45 - 03:00",
    "Purchase Bid (MW)": 5126.8,
    "Sell Bid (MW) - Total (MW)": 316.1,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 308.1,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 316.1,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 308.1,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 316.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 308.1,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 4,
    "Time Block": "03:00 - 03:15",
    "Purchase Bid (MW)": 5102.8,
    "Sell Bid (MW) - Total (MW)": 298.9,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 290.9,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 298.9,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 290.9,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 298.9,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 290.9,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 4,
    "Time Block": "03:15 - 03:30",
    "Purchase Bid (MW)": 5074.8,
    "Sell Bid (MW) - Total (MW)": 276.2,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 268.2,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 276.2,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 268.2,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 276.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 268.2,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 4,
    "Time Block": "03:30 - 03:45",
    "Purchase Bid (MW)": 5020.3,
    "Sell Bid (MW) - Total (MW)": 272.6,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 264.6,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 272.58,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 264.59,
    "MCV (MW) - Hydro (MW)": 7.99,
    "Final Scheduled Volume (MW) - Total (MW)": 272.58,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 264.59,
    "Final Scheduled Volume (MW) - Hydro (MW)": 7.99,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 4,
    "Time Block": "03:45 - 04:00",
    "Purchase Bid (MW)": 4954.2,
    "Sell Bid (MW) - Total (MW)": 271,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 263,
    "Sell Bid (MW) - Hydro (MW)": 8,
    "MCV (MW) - Total (MW)": 271,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 263,
    "MCV (MW) - Hydro (MW)": 8,
    "Final Scheduled Volume (MW) - Total (MW)": 271,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 263,
    "Final Scheduled Volume (MW) - Hydro (MW)": 8,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 5,
    "Time Block": "04:00 - 04:15",
    "Purchase Bid (MW)": 4905.6,
    "Sell Bid (MW) - Total (MW)": 266.2,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 261.2,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 266.19,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 261.19,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 266.19,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 261.19,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 5,
    "Time Block": "04:15 - 04:30",
    "Purchase Bid (MW)": 5022.9,
    "Sell Bid (MW) - Total (MW)": 263.5,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 258.5,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 263.5,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 258.5,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 263.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 258.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 5,
    "Time Block": "04:30 - 04:45",
    "Purchase Bid (MW)": 4976.4,
    "Sell Bid (MW) - Total (MW)": 260.1,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 255.1,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 260.1,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 255.1,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 260.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 255.1,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 5,
    "Time Block": "04:45 - 05:00",
    "Purchase Bid (MW)": 5034.4,
    "Sell Bid (MW) - Total (MW)": 256.8,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 251.8,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 256.79,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 251.79,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 256.79,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 251.79,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 6,
    "Time Block": "05:00 - 05:15",
    "Purchase Bid (MW)": 4959.7,
    "Sell Bid (MW) - Total (MW)": 250.3,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 245.3,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 250.3,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 245.3,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 250.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 245.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 6,
    "Time Block": "05:15 - 05:30",
    "Purchase Bid (MW)": 5224.5,
    "Sell Bid (MW) - Total (MW)": 248.8,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 243.8,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 248.8,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 243.8,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 248.8,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 243.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 6,
    "Time Block": "05:30 - 05:45",
    "Purchase Bid (MW)": 5286.6,
    "Sell Bid (MW) - Total (MW)": 239.8,
    "Sell Bid (MW) - Solar (MW)": 0.1,
    "Sell Bid (MW) - Non-Solar (MW)": 234.7,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 239.79,
    "MCV (MW) - Solar (MW)": 0.1,
    "MCV (MW) - Non-Solar (MW)": 234.69,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 239.79,
    "Final Scheduled Volume (MW) - Solar (MW)": 0.1,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 234.69,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 6,
    "Time Block": "05:45 - 06:00",
    "Purchase Bid (MW)": 5301.8,
    "Sell Bid (MW) - Total (MW)": 237.9,
    "Sell Bid (MW) - Solar (MW)": 0.4,
    "Sell Bid (MW) - Non-Solar (MW)": 232.5,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 237.9,
    "MCV (MW) - Solar (MW)": 0.4,
    "MCV (MW) - Non-Solar (MW)": 232.5,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 237.9,
    "Final Scheduled Volume (MW) - Solar (MW)": 0.4,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 232.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 7,
    "Time Block": "06:00 - 06:15",
    "Purchase Bid (MW)": 5734.7,
    "Sell Bid (MW) - Total (MW)": 380.3,
    "Sell Bid (MW) - Solar (MW)": 6.9,
    "Sell Bid (MW) - Non-Solar (MW)": 368.4,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 380.3,
    "MCV (MW) - Solar (MW)": 6.9,
    "MCV (MW) - Non-Solar (MW)": 368.4,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 380.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 6.9,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 368.4,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 7,
    "Time Block": "06:15 - 06:30",
    "Purchase Bid (MW)": 5714.8,
    "Sell Bid (MW) - Total (MW)": 400.4,
    "Sell Bid (MW) - Solar (MW)": 32,
    "Sell Bid (MW) - Non-Solar (MW)": 363.4,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 400.37,
    "MCV (MW) - Solar (MW)": 32,
    "MCV (MW) - Non-Solar (MW)": 363.37,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 400.37,
    "Final Scheduled Volume (MW) - Solar (MW)": 32,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 363.37,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 7,
    "Time Block": "06:30 - 06:45",
    "Purchase Bid (MW)": 5390.1,
    "Sell Bid (MW) - Total (MW)": 507.4,
    "Sell Bid (MW) - Solar (MW)": 142.1,
    "Sell Bid (MW) - Non-Solar (MW)": 360.3,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 507.4,
    "MCV (MW) - Solar (MW)": 142.1,
    "MCV (MW) - Non-Solar (MW)": 360.3,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 507.4,
    "Final Scheduled Volume (MW) - Solar (MW)": 142.1,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 360.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 7,
    "Time Block": "06:45 - 07:00",
    "Purchase Bid (MW)": 4924.1,
    "Sell Bid (MW) - Total (MW)": 730,
    "Sell Bid (MW) - Solar (MW)": 363.8,
    "Sell Bid (MW) - Non-Solar (MW)": 361.2,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 729.99,
    "MCV (MW) - Solar (MW)": 363.8,
    "MCV (MW) - Non-Solar (MW)": 361.19,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 729.99,
    "Final Scheduled Volume (MW) - Solar (MW)": 363.8,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 361.19,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 8,
    "Time Block": "07:00 - 07:15",
    "Purchase Bid (MW)": 5129.4,
    "Sell Bid (MW) - Total (MW)": 1187.7,
    "Sell Bid (MW) - Solar (MW)": 757.4,
    "Sell Bid (MW) - Non-Solar (MW)": 425.3,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 768.2,
    "MCV (MW) - Solar (MW)": 494,
    "MCV (MW) - Non-Solar (MW)": 269.2,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 768.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 494,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 269.2,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 6200.52,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 8,
    "Time Block": "07:15 - 07:30",
    "Purchase Bid (MW)": 4996.7,
    "Sell Bid (MW) - Total (MW)": 1781.6,
    "Sell Bid (MW) - Solar (MW)": 1350,
    "Sell Bid (MW) - Non-Solar (MW)": 426.6,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 1032,
    "MCV (MW) - Solar (MW)": 764.7,
    "MCV (MW) - Non-Solar (MW)": 262.3,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 1032,
    "Final Scheduled Volume (MW) - Solar (MW)": 764.7,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 262.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 5200.98,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 8,
    "Time Block": "07:30 - 07:45",
    "Purchase Bid (MW)": 4814.9,
    "Sell Bid (MW) - Total (MW)": 2338.9,
    "Sell Bid (MW) - Solar (MW)": 1943,
    "Sell Bid (MW) - Non-Solar (MW)": 390.9,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 1291.2,
    "MCV (MW) - Solar (MW)": 1067.4,
    "MCV (MW) - Non-Solar (MW)": 218.8,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 1291.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 1067.4,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 218.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 4300.22,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 8,
    "Time Block": "07:45 - 08:00",
    "Purchase Bid (MW)": 4669.5,
    "Sell Bid (MW) - Total (MW)": 2898.8,
    "Sell Bid (MW) - Solar (MW)": 2509.7,
    "Sell Bid (MW) - Non-Solar (MW)": 384.1,
    "Sell Bid (MW) - Hydro (MW)": 5,
    "MCV (MW) - Total (MW)": 1596.2,
    "MCV (MW) - Solar (MW)": 1385.2,
    "MCV (MW) - Non-Solar (MW)": 206,
    "MCV (MW) - Hydro (MW)": 5,
    "Final Scheduled Volume (MW) - Total (MW)": 1596.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 1385.2,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 206,
    "Final Scheduled Volume (MW) - Hydro (MW)": 5,
    "MCP (Rs/MWh)": 3850.32,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 9,
    "Time Block": "08:00 - 08:15",
    "Purchase Bid (MW)": 5085.7,
    "Sell Bid (MW) - Total (MW)": 3266,
    "Sell Bid (MW) - Solar (MW)": 2845.8,
    "Sell Bid (MW) - Non-Solar (MW)": 393.7,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 1992.5,
    "MCV (MW) - Solar (MW)": 1733.37,
    "MCV (MW) - Non-Solar (MW)": 232.63,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 1992.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 1733.37,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 232.63,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 3599.14,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 9,
    "Time Block": "08:15 - 08:30",
    "Purchase Bid (MW)": 5259.9,
    "Sell Bid (MW) - Total (MW)": 3602.3,
    "Sell Bid (MW) - Solar (MW)": 3208.6,
    "Sell Bid (MW) - Non-Solar (MW)": 367.2,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 2664.97,
    "MCV (MW) - Solar (MW)": 2343.41,
    "MCV (MW) - Non-Solar (MW)": 295.06,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2664.97,
    "Final Scheduled Volume (MW) - Solar (MW)": 2343.41,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 295.06,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 2600.59,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 9,
    "Time Block": "08:30 - 08:45",
    "Purchase Bid (MW)": 5412,
    "Sell Bid (MW) - Total (MW)": 3875.2,
    "Sell Bid (MW) - Solar (MW)": 3442.2,
    "Sell Bid (MW) - Non-Solar (MW)": 406.5,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 2656.48,
    "MCV (MW) - Solar (MW)": 2339.06,
    "MCV (MW) - Non-Solar (MW)": 290.92,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2656.48,
    "Final Scheduled Volume (MW) - Solar (MW)": 2339.06,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 290.92,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 2520.47,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 9,
    "Time Block": "08:45 - 09:00",
    "Purchase Bid (MW)": 5482.5,
    "Sell Bid (MW) - Total (MW)": 4026.7,
    "Sell Bid (MW) - Solar (MW)": 3594,
    "Sell Bid (MW) - Non-Solar (MW)": 406.2,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 2076,
    "MCV (MW) - Solar (MW)": 1855.4,
    "MCV (MW) - Non-Solar (MW)": 194.1,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2076,
    "Final Scheduled Volume (MW) - Solar (MW)": 1855.4,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 194.1,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 2600,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 10,
    "Time Block": "09:00 - 09:15",
    "Purchase Bid (MW)": 6038,
    "Sell Bid (MW) - Total (MW)": 4287,
    "Sell Bid (MW) - Solar (MW)": 3803,
    "Sell Bid (MW) - Non-Solar (MW)": 457.5,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 2540.8,
    "MCV (MW) - Solar (MW)": 2254.41,
    "MCV (MW) - Non-Solar (MW)": 259.89,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2540.8,
    "Final Scheduled Volume (MW) - Solar (MW)": 2254.41,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 259.89,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 2450.24,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 10,
    "Time Block": "09:15 - 09:30",
    "Purchase Bid (MW)": 6012.8,
    "Sell Bid (MW) - Total (MW)": 4256.2,
    "Sell Bid (MW) - Solar (MW)": 3795.4,
    "Sell Bid (MW) - Non-Solar (MW)": 434.3,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 2417.92,
    "MCV (MW) - Solar (MW)": 2160.41,
    "MCV (MW) - Non-Solar (MW)": 231.01,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2417.92,
    "Final Scheduled Volume (MW) - Solar (MW)": 2160.41,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 231.01,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 2501.13,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 10,
    "Time Block": "09:30 - 09:45",
    "Purchase Bid (MW)": 6031.6,
    "Sell Bid (MW) - Total (MW)": 3912.3,
    "Sell Bid (MW) - Solar (MW)": 3471.2,
    "Sell Bid (MW) - Non-Solar (MW)": 414.6,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 2199.6,
    "MCV (MW) - Solar (MW)": 1945.37,
    "MCV (MW) - Non-Solar (MW)": 227.73,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2199.6,
    "Final Scheduled Volume (MW) - Solar (MW)": 1945.37,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 227.73,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 2518.11,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 10,
    "Time Block": "09:45 - 10:00",
    "Purchase Bid (MW)": 6107.9,
    "Sell Bid (MW) - Total (MW)": 3744.9,
    "Sell Bid (MW) - Solar (MW)": 3298.8,
    "Sell Bid (MW) - Non-Solar (MW)": 419.6,
    "Sell Bid (MW) - Hydro (MW)": 26.5,
    "MCV (MW) - Total (MW)": 2211.1,
    "MCV (MW) - Solar (MW)": 1941.67,
    "MCV (MW) - Non-Solar (MW)": 242.93,
    "MCV (MW) - Hydro (MW)": 26.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2211.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 1941.67,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 242.93,
    "Final Scheduled Volume (MW) - Hydro (MW)": 26.5,
    "MCP (Rs/MWh)": 2512.17,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 11,
    "Time Block": "10:00 - 10:15",
    "Purchase Bid (MW)": 6223.7,
    "Sell Bid (MW) - Total (MW)": 2962.6,
    "Sell Bid (MW) - Solar (MW)": 2518.8,
    "Sell Bid (MW) - Non-Solar (MW)": 420.3,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2386,
    "MCV (MW) - Solar (MW)": 2006.07,
    "MCV (MW) - Non-Solar (MW)": 356.43,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2386,
    "Final Scheduled Volume (MW) - Solar (MW)": 2006.07,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 356.43,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2199.78,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 11,
    "Time Block": "10:15 - 10:30",
    "Purchase Bid (MW)": 6281.7,
    "Sell Bid (MW) - Total (MW)": 2858.8,
    "Sell Bid (MW) - Solar (MW)": 2408.3,
    "Sell Bid (MW) - Non-Solar (MW)": 427,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2641,
    "MCV (MW) - Solar (MW)": 2213.2,
    "MCV (MW) - Non-Solar (MW)": 404.3,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2641,
    "Final Scheduled Volume (MW) - Solar (MW)": 2213.2,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 404.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2151.84,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 11,
    "Time Block": "10:30 - 10:45",
    "Purchase Bid (MW)": 6384.5,
    "Sell Bid (MW) - Total (MW)": 2794.5,
    "Sell Bid (MW) - Solar (MW)": 2341.3,
    "Sell Bid (MW) - Non-Solar (MW)": 429.7,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2440.2,
    "MCV (MW) - Solar (MW)": 2032.2,
    "MCV (MW) - Non-Solar (MW)": 384.5,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2440.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 2032.2,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 384.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2079.89,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 11,
    "Time Block": "10:45 - 11:00",
    "Purchase Bid (MW)": 6419.2,
    "Sell Bid (MW) - Total (MW)": 3387.4,
    "Sell Bid (MW) - Solar (MW)": 2931.1,
    "Sell Bid (MW) - Non-Solar (MW)": 432.8,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2457,
    "MCV (MW) - Solar (MW)": 2121.87,
    "MCV (MW) - Non-Solar (MW)": 311.63,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2457,
    "Final Scheduled Volume (MW) - Solar (MW)": 2121.87,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 311.63,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2021.5,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 12,
    "Time Block": "11:00 - 11:15",
    "Purchase Bid (MW)": 5937.5,
    "Sell Bid (MW) - Total (MW)": 2776.8,
    "Sell Bid (MW) - Solar (MW)": 2316.2,
    "Sell Bid (MW) - Non-Solar (MW)": 437.1,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2601.4,
    "MCV (MW) - Solar (MW)": 2161.3,
    "MCV (MW) - Non-Solar (MW)": 416.6,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2601.4,
    "Final Scheduled Volume (MW) - Solar (MW)": 2161.3,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 416.6,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2002.32,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 12,
    "Time Block": "11:15 - 11:30",
    "Purchase Bid (MW)": 5963.6,
    "Sell Bid (MW) - Total (MW)": 2787.7,
    "Sell Bid (MW) - Solar (MW)": 2329.2,
    "Sell Bid (MW) - Non-Solar (MW)": 435,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2612.5,
    "MCV (MW) - Solar (MW)": 2172.8,
    "MCV (MW) - Non-Solar (MW)": 416.2,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2612.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 2172.8,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 416.2,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2002.27,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 12,
    "Time Block": "11:30 - 11:45",
    "Purchase Bid (MW)": 5993.5,
    "Sell Bid (MW) - Total (MW)": 2791.6,
    "Sell Bid (MW) - Solar (MW)": 2336.2,
    "Sell Bid (MW) - Non-Solar (MW)": 431.9,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2630.1,
    "MCV (MW) - Solar (MW)": 2192,
    "MCV (MW) - Non-Solar (MW)": 414.6,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2630.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 2192,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 414.6,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2001.94,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 12,
    "Time Block": "11:45 - 12:00",
    "Purchase Bid (MW)": 5991.6,
    "Sell Bid (MW) - Total (MW)": 2794,
    "Sell Bid (MW) - Solar (MW)": 2338.9,
    "Sell Bid (MW) - Non-Solar (MW)": 431.6,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2633.6,
    "MCV (MW) - Solar (MW)": 2194.8,
    "MCV (MW) - Non-Solar (MW)": 415.3,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2633.6,
    "Final Scheduled Volume (MW) - Solar (MW)": 2194.8,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 415.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2001.57,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 13,
    "Time Block": "12:00 - 12:15",
    "Purchase Bid (MW)": 5623.1,
    "Sell Bid (MW) - Total (MW)": 2790.2,
    "Sell Bid (MW) - Solar (MW)": 2344.1,
    "Sell Bid (MW) - Non-Solar (MW)": 422.6,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2454.5,
    "MCV (MW) - Solar (MW)": 2023.9,
    "MCV (MW) - Non-Solar (MW)": 407.1,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2454.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 2023.9,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 407.1,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1850.49,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 13,
    "Time Block": "12:15 - 12:30",
    "Purchase Bid (MW)": 5807.2,
    "Sell Bid (MW) - Total (MW)": 2789.5,
    "Sell Bid (MW) - Solar (MW)": 2344.6,
    "Sell Bid (MW) - Non-Solar (MW)": 421.4,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2455.7,
    "MCV (MW) - Solar (MW)": 2025.5,
    "MCV (MW) - Non-Solar (MW)": 406.7,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2455.7,
    "Final Scheduled Volume (MW) - Solar (MW)": 2025.5,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 406.7,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1850.82,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 13,
    "Time Block": "12:30 - 12:45",
    "Purchase Bid (MW)": 5945.6,
    "Sell Bid (MW) - Total (MW)": 2794,
    "Sell Bid (MW) - Solar (MW)": 2346.4,
    "Sell Bid (MW) - Non-Solar (MW)": 424.1,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2460.5,
    "MCV (MW) - Solar (MW)": 2027.2,
    "MCV (MW) - Non-Solar (MW)": 409.8,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2460.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 2027.2,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 409.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1800.9,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 13,
    "Time Block": "12:45 - 13:00",
    "Purchase Bid (MW)": 5959.1,
    "Sell Bid (MW) - Total (MW)": 2793.6,
    "Sell Bid (MW) - Solar (MW)": 2344.3,
    "Sell Bid (MW) - Non-Solar (MW)": 425.8,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2461.6,
    "MCV (MW) - Solar (MW)": 2026.3,
    "MCV (MW) - Non-Solar (MW)": 411.8,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2461.6,
    "Final Scheduled Volume (MW) - Solar (MW)": 2026.3,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 411.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1800.74,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 14,
    "Time Block": "13:00 - 13:15",
    "Purchase Bid (MW)": 6003.2,
    "Sell Bid (MW) - Total (MW)": 3407.8,
    "Sell Bid (MW) - Solar (MW)": 2955.6,
    "Sell Bid (MW) - Non-Solar (MW)": 428.7,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2646.89,
    "MCV (MW) - Solar (MW)": 2245.93,
    "MCV (MW) - Non-Solar (MW)": 377.46,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2646.89,
    "Final Scheduled Volume (MW) - Solar (MW)": 2245.93,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 377.46,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1653.81,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 14,
    "Time Block": "13:15 - 13:30",
    "Purchase Bid (MW)": 6080,
    "Sell Bid (MW) - Total (MW)": 3394.7,
    "Sell Bid (MW) - Solar (MW)": 2941.4,
    "Sell Bid (MW) - Non-Solar (MW)": 429.8,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2633.7,
    "MCV (MW) - Solar (MW)": 2232.39,
    "MCV (MW) - Non-Solar (MW)": 377.81,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2633.7,
    "Final Scheduled Volume (MW) - Solar (MW)": 2232.39,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 377.81,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1685.81,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 14,
    "Time Block": "13:30 - 13:45",
    "Purchase Bid (MW)": 6182.3,
    "Sell Bid (MW) - Total (MW)": 2766.3,
    "Sell Bid (MW) - Solar (MW)": 2309.3,
    "Sell Bid (MW) - Non-Solar (MW)": 433.5,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2613.2,
    "MCV (MW) - Solar (MW)": 2170.3,
    "MCV (MW) - Non-Solar (MW)": 419.4,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2613.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 2170.3,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 419.4,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1850.19,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 14,
    "Time Block": "13:45 - 14:00",
    "Purchase Bid (MW)": 6323.3,
    "Sell Bid (MW) - Total (MW)": 3358.9,
    "Sell Bid (MW) - Solar (MW)": 2899.2,
    "Sell Bid (MW) - Non-Solar (MW)": 436.2,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2694.3,
    "MCV (MW) - Solar (MW)": 2315.49,
    "MCV (MW) - Non-Solar (MW)": 355.31,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2694.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 2315.49,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 355.31,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 1839.66,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 15,
    "Time Block": "14:00 - 14:15",
    "Purchase Bid (MW)": 6216.8,
    "Sell Bid (MW) - Total (MW)": 3339.4,
    "Sell Bid (MW) - Solar (MW)": 2878.5,
    "Sell Bid (MW) - Non-Solar (MW)": 437.4,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 3019.5,
    "MCV (MW) - Solar (MW)": 2574.4,
    "MCV (MW) - Non-Solar (MW)": 421.6,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 3019.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 2574.4,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 421.6,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2100.31,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 15,
    "Time Block": "14:15 - 14:30",
    "Purchase Bid (MW)": 6491.1,
    "Sell Bid (MW) - Total (MW)": 2720.9,
    "Sell Bid (MW) - Solar (MW)": 2258.5,
    "Sell Bid (MW) - Non-Solar (MW)": 438.9,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2579.1,
    "MCV (MW) - Solar (MW)": 2132,
    "MCV (MW) - Non-Solar (MW)": 423.6,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2579.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 2132,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 423.6,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2201.78,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 15,
    "Time Block": "14:30 - 14:45",
    "Purchase Bid (MW)": 6478,
    "Sell Bid (MW) - Total (MW)": 2697,
    "Sell Bid (MW) - Solar (MW)": 2233.2,
    "Sell Bid (MW) - Non-Solar (MW)": 440.3,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2374.69,
    "MCV (MW) - Solar (MW)": 1944.4,
    "MCV (MW) - Non-Solar (MW)": 406.79,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2374.69,
    "Final Scheduled Volume (MW) - Solar (MW)": 1944.4,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 406.79,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2461.87,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 15,
    "Time Block": "14:45 - 15:00",
    "Purchase Bid (MW)": 6649.2,
    "Sell Bid (MW) - Total (MW)": 2661,
    "Sell Bid (MW) - Solar (MW)": 2195.9,
    "Sell Bid (MW) - Non-Solar (MW)": 441.6,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2032.2,
    "MCV (MW) - Solar (MW)": 1643.16,
    "MCV (MW) - Non-Solar (MW)": 365.54,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2032.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 1643.16,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 365.54,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 2610.65,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 16,
    "Time Block": "15:00 - 15:15",
    "Purchase Bid (MW)": 6607.4,
    "Sell Bid (MW) - Total (MW)": 2510.5,
    "Sell Bid (MW) - Solar (MW)": 2033.1,
    "Sell Bid (MW) - Non-Solar (MW)": 453.9,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2422.8,
    "MCV (MW) - Solar (MW)": 1953.8,
    "MCV (MW) - Non-Solar (MW)": 445.5,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2422.8,
    "Final Scheduled Volume (MW) - Solar (MW)": 1953.8,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 445.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 3254.82,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 16,
    "Time Block": "15:15 - 15:30",
    "Purchase Bid (MW)": 6984.8,
    "Sell Bid (MW) - Total (MW)": 2522.6,
    "Sell Bid (MW) - Solar (MW)": 2034.1,
    "Sell Bid (MW) - Non-Solar (MW)": 465,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2437,
    "MCV (MW) - Solar (MW)": 1957.8,
    "MCV (MW) - Non-Solar (MW)": 455.7,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2437,
    "Final Scheduled Volume (MW) - Solar (MW)": 1957.8,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 455.7,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 3302.17,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 16,
    "Time Block": "15:30 - 15:45",
    "Purchase Bid (MW)": 7152.3,
    "Sell Bid (MW) - Total (MW)": 2556,
    "Sell Bid (MW) - Solar (MW)": 2061.4,
    "Sell Bid (MW) - Non-Solar (MW)": 471.1,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2475.1,
    "MCV (MW) - Solar (MW)": 1990.6,
    "MCV (MW) - Non-Solar (MW)": 461,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2475.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 1990.6,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 461,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 3401.59,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 16,
    "Time Block": "15:45 - 16:00",
    "Purchase Bid (MW)": 7069.5,
    "Sell Bid (MW) - Total (MW)": 2675.2,
    "Sell Bid (MW) - Solar (MW)": 2173.2,
    "Sell Bid (MW) - Non-Solar (MW)": 478.5,
    "Sell Bid (MW) - Hydro (MW)": 23.5,
    "MCV (MW) - Total (MW)": 2584.8,
    "MCV (MW) - Solar (MW)": 2094.3,
    "MCV (MW) - Non-Solar (MW)": 467,
    "MCV (MW) - Hydro (MW)": 23.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2584.8,
    "Final Scheduled Volume (MW) - Solar (MW)": 2094.3,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 467,
    "Final Scheduled Volume (MW) - Hydro (MW)": 23.5,
    "MCP (Rs/MWh)": 3400.83,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 17,
    "Time Block": "16:00 - 16:15",
    "Purchase Bid (MW)": 6598.4,
    "Sell Bid (MW) - Total (MW)": 3227.8,
    "Sell Bid (MW) - Solar (MW)": 2704.1,
    "Sell Bid (MW) - Non-Solar (MW)": 498.2,
    "Sell Bid (MW) - Hydro (MW)": 25.5,
    "MCV (MW) - Total (MW)": 2295.4,
    "MCV (MW) - Solar (MW)": 1904.98,
    "MCV (MW) - Non-Solar (MW)": 364.92,
    "MCV (MW) - Hydro (MW)": 25.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2295.4,
    "Final Scheduled Volume (MW) - Solar (MW)": 1904.98,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 364.92,
    "Final Scheduled Volume (MW) - Hydro (MW)": 25.5,
    "MCP (Rs/MWh)": 3438.44,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 17,
    "Time Block": "16:15 - 16:30",
    "Purchase Bid (MW)": 6611.5,
    "Sell Bid (MW) - Total (MW)": 3255.2,
    "Sell Bid (MW) - Solar (MW)": 2719.1,
    "Sell Bid (MW) - Non-Solar (MW)": 510.6,
    "Sell Bid (MW) - Hydro (MW)": 25.5,
    "MCV (MW) - Total (MW)": 2222.25,
    "MCV (MW) - Solar (MW)": 1838.13,
    "MCV (MW) - Non-Solar (MW)": 358.62,
    "MCV (MW) - Hydro (MW)": 25.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2222.25,
    "Final Scheduled Volume (MW) - Solar (MW)": 1838.13,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 358.62,
    "Final Scheduled Volume (MW) - Hydro (MW)": 25.5,
    "MCP (Rs/MWh)": 3500.36,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 17,
    "Time Block": "16:30 - 16:45",
    "Purchase Bid (MW)": 6088.3,
    "Sell Bid (MW) - Total (MW)": 2684.3,
    "Sell Bid (MW) - Solar (MW)": 2142.4,
    "Sell Bid (MW) - Non-Solar (MW)": 516.4,
    "Sell Bid (MW) - Hydro (MW)": 25.5,
    "MCV (MW) - Total (MW)": 2016.7,
    "MCV (MW) - Solar (MW)": 1573.05,
    "MCV (MW) - Non-Solar (MW)": 418.15,
    "MCV (MW) - Hydro (MW)": 25.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2016.7,
    "Final Scheduled Volume (MW) - Solar (MW)": 1573.05,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 418.15,
    "Final Scheduled Volume (MW) - Hydro (MW)": 25.5,
    "MCP (Rs/MWh)": 3887.61,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 17,
    "Time Block": "16:45 - 17:00",
    "Purchase Bid (MW)": 5849.6,
    "Sell Bid (MW) - Total (MW)": 2571,
    "Sell Bid (MW) - Solar (MW)": 2028.5,
    "Sell Bid (MW) - Non-Solar (MW)": 517,
    "Sell Bid (MW) - Hydro (MW)": 25.5,
    "MCV (MW) - Total (MW)": 2069.69,
    "MCV (MW) - Solar (MW)": 1603.54,
    "MCV (MW) - Non-Solar (MW)": 440.65,
    "MCV (MW) - Hydro (MW)": 25.5,
    "Final Scheduled Volume (MW) - Total (MW)": 2069.69,
    "Final Scheduled Volume (MW) - Solar (MW)": 1603.54,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 440.65,
    "Final Scheduled Volume (MW) - Hydro (MW)": 25.5,
    "MCP (Rs/MWh)": 3920.72,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 18,
    "Time Block": "17:00 - 17:15",
    "Purchase Bid (MW)": 5760.8,
    "Sell Bid (MW) - Total (MW)": 2642.8,
    "Sell Bid (MW) - Solar (MW)": 2163.7,
    "Sell Bid (MW) - Non-Solar (MW)": 475.1,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 1739.2,
    "MCV (MW) - Solar (MW)": 1387,
    "MCV (MW) - Non-Solar (MW)": 348.2,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 1739.2,
    "Final Scheduled Volume (MW) - Solar (MW)": 1387,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 348.2,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 4250.89,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 18,
    "Time Block": "17:15 - 17:30",
    "Purchase Bid (MW)": 5772.1,
    "Sell Bid (MW) - Total (MW)": 2394.5,
    "Sell Bid (MW) - Solar (MW)": 1920,
    "Sell Bid (MW) - Non-Solar (MW)": 470.5,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 1593.8,
    "MCV (MW) - Solar (MW)": 1240.1,
    "MCV (MW) - Non-Solar (MW)": 349.7,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 1593.8,
    "Final Scheduled Volume (MW) - Solar (MW)": 1240.1,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 349.7,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 5000.8,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 18,
    "Time Block": "17:30 - 17:45",
    "Purchase Bid (MW)": 5664.9,
    "Sell Bid (MW) - Total (MW)": 2264.5,
    "Sell Bid (MW) - Solar (MW)": 1770.5,
    "Sell Bid (MW) - Non-Solar (MW)": 490,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 1831.28,
    "MCV (MW) - Solar (MW)": 1403.74,
    "MCV (MW) - Non-Solar (MW)": 423.54,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 1831.28,
    "Final Scheduled Volume (MW) - Solar (MW)": 1403.74,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 423.54,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 9998.47,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 18,
    "Time Block": "17:45 - 18:00",
    "Purchase Bid (MW)": 5745,
    "Sell Bid (MW) - Total (MW)": 1513.1,
    "Sell Bid (MW) - Solar (MW)": 1196.3,
    "Sell Bid (MW) - Non-Solar (MW)": 312.8,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 1513.1,
    "MCV (MW) - Solar (MW)": 1196.3,
    "MCV (MW) - Non-Solar (MW)": 312.8,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 1513.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 1196.3,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 312.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 19,
    "Time Block": "18:00 - 18:15",
    "Purchase Bid (MW)": 5462.3,
    "Sell Bid (MW) - Total (MW)": 1290.3,
    "Sell Bid (MW) - Solar (MW)": 1019.5,
    "Sell Bid (MW) - Non-Solar (MW)": 266.8,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 1290.3,
    "MCV (MW) - Solar (MW)": 1019.5,
    "MCV (MW) - Non-Solar (MW)": 266.8,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 1290.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 1019.5,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 266.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 19,
    "Time Block": "18:15 - 18:30",
    "Purchase Bid (MW)": 5684.8,
    "Sell Bid (MW) - Total (MW)": 893,
    "Sell Bid (MW) - Solar (MW)": 632.2,
    "Sell Bid (MW) - Non-Solar (MW)": 256.8,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 893,
    "MCV (MW) - Solar (MW)": 632.2,
    "MCV (MW) - Non-Solar (MW)": 256.8,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 893,
    "Final Scheduled Volume (MW) - Solar (MW)": 632.2,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 256.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 19,
    "Time Block": "18:30 - 18:45",
    "Purchase Bid (MW)": 6066.5,
    "Sell Bid (MW) - Total (MW)": 527.1,
    "Sell Bid (MW) - Solar (MW)": 285.6,
    "Sell Bid (MW) - Non-Solar (MW)": 237.5,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 527.1,
    "MCV (MW) - Solar (MW)": 285.6,
    "MCV (MW) - Non-Solar (MW)": 237.5,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 527.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 285.6,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 237.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 19,
    "Time Block": "18:45 - 19:00",
    "Purchase Bid (MW)": 6324.9,
    "Sell Bid (MW) - Total (MW)": 320,
    "Sell Bid (MW) - Solar (MW)": 85.2,
    "Sell Bid (MW) - Non-Solar (MW)": 230.8,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 320,
    "MCV (MW) - Solar (MW)": 85.2,
    "MCV (MW) - Non-Solar (MW)": 230.8,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 320,
    "Final Scheduled Volume (MW) - Solar (MW)": 85.2,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 230.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 20,
    "Time Block": "19:00 - 19:15",
    "Purchase Bid (MW)": 7134.9,
    "Sell Bid (MW) - Total (MW)": 244.1,
    "Sell Bid (MW) - Solar (MW)": 1.4,
    "Sell Bid (MW) - Non-Solar (MW)": 238.7,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 244.06,
    "MCV (MW) - Solar (MW)": 1.4,
    "MCV (MW) - Non-Solar (MW)": 238.66,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 244.06,
    "Final Scheduled Volume (MW) - Solar (MW)": 1.4,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 238.66,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 20,
    "Time Block": "19:15 - 19:30",
    "Purchase Bid (MW)": 7289.4,
    "Sell Bid (MW) - Total (MW)": 244.8,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 240.8,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 244.79,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 240.79,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 244.79,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 240.79,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 20,
    "Time Block": "19:30 - 19:45",
    "Purchase Bid (MW)": 7231.5,
    "Sell Bid (MW) - Total (MW)": 244,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 240,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 244,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 240,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 244,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 240,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 20,
    "Time Block": "19:45 - 20:00",
    "Purchase Bid (MW)": 7096.5,
    "Sell Bid (MW) - Total (MW)": 245.5,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 241.5,
    "Sell Bid (MW) - Hydro (MW)": 4,
    "MCV (MW) - Total (MW)": 245.48,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 241.48,
    "MCV (MW) - Hydro (MW)": 4,
    "Final Scheduled Volume (MW) - Total (MW)": 245.48,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 241.48,
    "Final Scheduled Volume (MW) - Hydro (MW)": 4,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 21,
    "Time Block": "20:00 - 20:15",
    "Purchase Bid (MW)": 6995.2,
    "Sell Bid (MW) - Total (MW)": 251.8,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 236.8,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 251.8,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 236.8,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 251.8,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 236.8,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 21,
    "Time Block": "20:15 - 20:30",
    "Purchase Bid (MW)": 6854.1,
    "Sell Bid (MW) - Total (MW)": 255.1,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 240.1,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 255.1,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 240.1,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 255.1,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 240.1,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 21,
    "Time Block": "20:30 - 20:45",
    "Purchase Bid (MW)": 6879.3,
    "Sell Bid (MW) - Total (MW)": 255.9,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 240.9,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 255.89,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 240.89,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 255.89,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 240.89,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 21,
    "Time Block": "20:45 - 21:00",
    "Purchase Bid (MW)": 6819.2,
    "Sell Bid (MW) - Total (MW)": 259.2,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 244.2,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 259.19,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 244.19,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 259.19,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 244.19,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 22,
    "Time Block": "21:00 - 21:15",
    "Purchase Bid (MW)": 6893.1,
    "Sell Bid (MW) - Total (MW)": 266.6,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 251.6,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 266.6,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 251.6,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 266.6,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 251.6,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 22,
    "Time Block": "21:15 - 21:30",
    "Purchase Bid (MW)": 6941.6,
    "Sell Bid (MW) - Total (MW)": 272.3,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 257.3,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 272.3,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 257.3,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 272.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 257.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 22,
    "Time Block": "21:30 - 21:45",
    "Purchase Bid (MW)": 6967,
    "Sell Bid (MW) - Total (MW)": 276.3,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 261.3,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 276.3,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 261.3,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 276.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 261.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 22,
    "Time Block": "21:45 - 22:00",
    "Purchase Bid (MW)": 6989.8,
    "Sell Bid (MW) - Total (MW)": 284.5,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 269.5,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 284.5,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 269.5,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 284.5,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 269.5,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 23,
    "Time Block": "22:00 - 22:15",
    "Purchase Bid (MW)": 6993.8,
    "Sell Bid (MW) - Total (MW)": 313.7,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 298.7,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 313.69,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 298.69,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 313.69,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 298.69,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 23,
    "Time Block": "22:15 - 22:30",
    "Purchase Bid (MW)": 6956.5,
    "Sell Bid (MW) - Total (MW)": 317.9,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 302.9,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 317.9,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 302.9,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 317.9,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 302.9,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 23,
    "Time Block": "22:30 - 22:45",
    "Purchase Bid (MW)": 7193.5,
    "Sell Bid (MW) - Total (MW)": 326.3,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 311.3,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 326.29,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 311.29,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 326.29,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 311.29,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 23,
    "Time Block": "22:45 - 23:00",
    "Purchase Bid (MW)": 7823,
    "Sell Bid (MW) - Total (MW)": 329.8,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 314.8,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 329.79,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 314.79,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 329.79,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 314.79,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 24,
    "Time Block": "23:00 - 23:15",
    "Purchase Bid (MW)": 8595.7,
    "Sell Bid (MW) - Total (MW)": 329.4,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 314.4,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 329.4,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 314.4,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 329.4,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 314.4,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 24,
    "Time Block": "23:15 - 23:30",
    "Purchase Bid (MW)": 8936.6,
    "Sell Bid (MW) - Total (MW)": 334.7,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 319.7,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 334.68,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 319.68,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 334.68,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 319.68,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 24,
    "Time Block": "23:30 - 23:45",
    "Purchase Bid (MW)": 9021.2,
    "Sell Bid (MW) - Total (MW)": 339.1,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 324.1,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 339.07,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 324.08,
    "MCV (MW) - Hydro (MW)": 14.99,
    "Final Scheduled Volume (MW) - Total (MW)": 339.07,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 324.08,
    "Final Scheduled Volume (MW) - Hydro (MW)": 14.99,
    "MCP (Rs/MWh)": 10000,
    "key_name": "green_day_ahead"
  },
  {
    "Date": "29-04-2026",
    "Hour": 24,
    "Time Block": "23:45 - 24:00",
    "Purchase Bid (MW)": 9355.1,
    "Sell Bid (MW) - Total (MW)": 341.3,
    "Sell Bid (MW) - Solar (MW)": 0,
    "Sell Bid (MW) - Non-Solar (MW)": 326.3,
    "Sell Bid (MW) - Hydro (MW)": 15,
    "MCV (MW) - Total (MW)": 341.3,
    "MCV (MW) - Solar (MW)": 0,
    "MCV (MW) - Non-Solar (MW)": 326.3,
    "MCV (MW) - Hydro (MW)": 15,
    "Final Scheduled Volume (MW) - Total (MW)": 341.3,
    "Final Scheduled Volume (MW) - Solar (MW)": 0,
    "Final Scheduled Volume (MW) - Non-Solar (MW)": 326.3,
    "Final Scheduled Volume (MW) - Hydro (MW)": 15,
    "MCP (Rs/MWh)": 10000,